QUALITY ASSURANCE
Quality Built Into Every Metre
Electrical safety is non-negotiable. At Peraton, quality controls are applied at defined stages from incoming material inspection through in-process checks and final product release.
View Conformance Documents
DEFINED CONTROL STAGES
The Peraton Quality Framework
Quality controls are applied at defined stages from incoming material inspection through in-process checks and final product release.
Stage 01
Incoming Material Inspection
- Conductor material verification against purchase specifications
- Polymer compound specific gravity and hardness checks
- Surface inspection of braiding yarn and taping inputs
- Verification of supplier certificates of analysis
Stage 02
In-Process Quality Controls
- Bunching stranding pitch and diameter monitoring
- Continuous extrusion temperature zone control
- 100% online high-voltage spark testing during primary insulation
- Wall thickness and concentricity monitoring
Stage 03
Finished Product Electrical Testing
- Conductor DC resistance measurement at 20°C reference
- Insulation resistance verification using high-megohm meters
- High-voltage immersion proof testing where applicable
- Core color coding verification and sequential meter print check
Stage 04
Traceability & Batch Documentation
- Batch number assignment linked to raw material lot references
- Internal inspection report generation and retention
- Guaranteed Technical Particulars (GTP) conformance check
- Pre-dispatch visual inspection and protective wrapping check
TESTING CLASSIFICATION
In-House Routine vs. Periodic Type Testing
We maintain clear operational separation between routine batch release tests and periodic type verification.
ROUTINE BATCH RELEASE
In-House Routine Testing
Performed internally on production batches prior to packaging and dispatch.
- Conductor DC Resistance Measurement (IS 8130): Measured at reference temperature of 20°C using calibrated micro-ohm resistance instrumentation.
- Insulation Resistance Measurement (IS 10810 / IS 694): Routine verification of dielectric insulation resistance across production lots.
- Online High-Voltage Spark Testing (IS 694): 100% continuous online high-voltage spark testing during primary extrusion.
- Dimensional & Concentricity Verification (IS 694): Optical and micrometer checks of conductor diameter, insulation wall thickness, and outer diameter.
- Visual Finish & Identification Legibility (Peraton QC Protocol): Inspection of surface smoothness, core color distinctiveness, and meter print legibility.
PERIODIC / TYPE VALIDATION
Periodic & Type Testing
Conducted periodically and during compound formulation qualification to verify flame and material standards.
- Oxygen Index & Temperature Index (IS 10810 (Part 58 / 64)): Periodic / compound verification for Flame Retardant Low Smoke (FRLS) compounds conducted under laboratory test conditions.
- Smoke Density Rating Test (IS 10810 (Part 63)): Periodic smoke transmittance testing on compound samples under controlled combustion.
- Acid Gas Emission Test (IS 10810 (Part 59)): Periodic acid gas generation test on compound samples to verify low corrosive gas release.
- Flame Retardance Test (IS 10810 (Part 53)): Periodic evaluation of flame propagation and self-extinguishing behavior.